  • All plans for new work (not being performed by PPS) that involve connections to building facilities, and utilities must be reviewed for approval by PPS to ensure full code compliance.
  • Work that requires modification of the building structure, such as installation of walls and doors, requires the approval of Campus Planning as well as PPS and may possibility require a NYC building permit.
  • All requests for department support should be submitted in writing to the Director of Physical Plant Services.
  • Any accessories such as bulletin boards, wall shelving and coat racks must be ordered by the requester and can be installed by PPS.
  • Departments are responsible for procurement of furniture, rugs, bulletin boards, wall shelving and coat racks for their own infrastructure support.
The cost of relocation of furniture in and out of the space to accommodate the rug installation should be part of the contract with the engaged contractor. If contractor does not include installation within the specification, funds should be set aside to reimburse PPS for the cost of labor.

Furniture Storage
There is no available space for storing furniture, but special arrangements might be considered through the Office of the Vice President of Finance and Management.

 
Facilities and Physical Plant Services
 
 
Contact Us
Facilities and Physical Plant Services
Compton-Goethals Building - Rm. 04
The City College of New York
160 Convent Avenue
New York, NY 10031

P  | 212-650-8689
F  | 212 650-8648
 
 
 
The City College of New York

160 Convent Avenue
New York, NY 10031
(212) 650 7000





Search with Google
 
© Copyright, The City College of The City University of New York. All rights reserved.
Website Powered by: CommonSpot
 
     
 
Go to www.cuny.edu (external link)